Gas connection to a house
Gas

Gas connection: from ESO conditions to boiler commissioning

A gas connection has several stages: application to ESO and connection conditions, design, external and internal pipework, documentation, meter and boiler commissioning. We manage the whole route from A to Z – you do not need to coordinate several contractors.

Gas connection
Dujotiekio tranšėja su signaline juosta
from 20 €published starting price · final price in the quote

Your benefits

Everything from A to Z

Application, design, installation, documents and commissioning – one contractor.

Less waiting

You coordinate with one team, not several.

Clear pricing

Our works at published 'from' prices, the ESO fee by the ESO calculator.

Safe

Work by certified specialists.

What's included

  • Help with the ESO application and conditions
  • External and internal pipework design
  • External pipework and meter cabinet
  • Internal pipework and pressure tests
  • Documentation and handover
  • Boiler connection and commissioning

Best for

New house near the gas networkHouse heated with solid fuelCommercial propertyPlant room upgrade

How it works

ESO issues connection conditions and the design is prepared accordingly. The external pipeline is brought to the meter cabinet and the internal pipework runs from there to the boiler. After pressure tests and documents the meter is installed, a supply contract is signed and the boiler is commissioned.

techninė
3D · Gas boiler + radiatorsSee it in 3D

Price

External and internal pipeworkfrom 20 €/m
Gas meter installationfrom 150 €
Gas boiler installationfrom 200 €

Prices are 'from' prices published by Inžinerijos slėnis. The final price is given in the quote after data review or survey.

Process

1Application to ESO
2Connection conditions
3Design
4External pipework
5Internal pipework
6Tests and documents
7Meter and commissioning

Our installations

Dujotiekio tranšėja su signaline juostaStatomas namas su dujų įvaduDujų įvado spintelė ant stovoDujotiekio įvadas į pastatą

Photos are from our own projects.

FAQ

How long does a gas connection take?

It depends on ESO conditions and distance to the network. Our part (design, installation, handover) usually takes a few weeks; the ESO network work timeline is set in the connection contract.

Is there state support for gas connection?

There is currently no support for connecting private houses to mains gas.

What do I need before starting?

Plot and building documents and a site plan with the meter location. We help with everything else.

Gas connection to a house – get a quote

Gas connection to a house

We send your home profile and calculation results along – the engineer sees everything, no need to repeat it on the phone.

See how your home will work – then we build it

Create your home profile in 2 minutes. The engineer gets your data, calculations and 3D configuration.

Build my system